Entrance to the plot from Jutrzenki Street.
Water, gas and electricity installations in the plot with two semi-detached houses.
According to the plans of the commune, the sewage system is to be built in the coming years.
The shape of the plot allows for any investment of any purpose.
The communication system emphasizes the investment value of the plot.
The distance from the Center is only 7 kilometers. The property is located several hundred meters away and the construction of the Salomea road junction is being completed.
Direct connection with the Katowice route and the A2 motorway. The WKD Warszawa Salomea railway stop is 800 meters away. Approximately 15 minutes drive to the Center.
Spatial Development Plan in preparation - second lining.
Basic building parameters:
1. office and service buildings, halls, warehouses ...
2.Maximum building height up to 12 m 3.minimum biologically active area 60% Utilities: gas, water, electricity, sewage (construction planned in 2019).
The property is located 300m from the city railway. Accessible by city buses.